[1]
“IMPLEMENTASI METODE PRECEDENCE DIAGRAM METHOD (PDM) DALAM PENGENDALIAN PROYEK KONSTRUKS”, JRFTSP, vol. 12, no. 2, pp. 175–182, Dec. 2022, doi: 10.37037/jrftsp.v12i2.136.